BBIG BASS
BUOYWORKS
Start shift ↘

FLOATING YARD · CONTRACT 03

Build above
the breakwater.

One moving crane. Three beacon contracts. Drop each steel section with exact overlap before Big Bass turns the harbor into a wave tank.

Report to the crane
HEAVY LIFT
PRECISION REQUIRED

CRANE CONTROL · LIVE

Drop clean.
Keep it standing.

The suspended section travels automatically. Tap, click, or press Space to release it. Only the overlapping steel remains; miss the tower and one safety bolt is gone.

CONTRACT1/3
LAYERS0/7
SAFETY BOLTS● ● ●
PERFECT RUN×0
YARD SCORE0000
BEST0000
01

LIFT ORDER READY

Fogline marker.

Build a seven-layer beacon. Every fourth section wakes the harbor and accelerates the crane.

YARD BRIEFING

Steel obeys
the overlap.

  1. 01

    Watch the hook

    The crane crosses the full gantry. Release only when the suspended section is centered over the last layer.

  2. 02

    Lose the overhang

    Any unsupported steel is cut away. The tower becomes permanently narrower after every imperfect drop.

  3. 03

    Brace for the wake

    At four-layer intervals, Big Bass jumps. The next lift runs faster until the harbor settles.

BEYOND THE FOG HORN

The harbor's
unofficial inspector.

Every completed beacon attracts the same enormous bass. It circles once, strikes the surface, then disappears beneath the pontoons—as if testing whether the tower deserves to remain.

Return to crane control ↑